Daily Water Supply
125,430
▲ DC Allocation: 45,000 m³ (36%)
🌊
Real-Time Flow
26,752m³/h
▲ DC Demand: 9,500 m³/h
🔍
Effluent Turbidity
0.32NTU
✓ Within Spec (<0.5)
🧪
Residual Chlorine
0.68mg/L
✓ Biofouling Control
⚙️
Equipment Online
98.6%
⚠ 6 faults active
Total Energy
12,546kWh
▲ DC Pumping: 4,200 kWh
🔄
Backup Reserve
76,430
61% Plant Capacity
Process Flow Digital Twin
Raw Water 26,752 m³/h ● RUNNING Reaction PAC: 18.6 mg/L pH: 7.05 ● RUNNING Sedimentation 2.15 NTU Sludge: 0.82m ● RUNNING V-Filter 0.18 NTU ΔP: 26 kPa ● RUNNING Clear Water 3.45m / 12,800m³ Cl: 0.68 mg/L ● NORMAL Pump Room 26,752 m³/h 4/5 Pumps Running ● RUNNING DC Distribution 9,500 m³/h 4 Clusters Active ● ACTIVE
Effluent Quality Real-Time
1
Turbidity (NTU)
0.32
2
Residual Chlorine (mg/L)
0.68
3
pH Value
7.32
4
Oxygen Consumption (mg/L)
1.25
5
Ammonia Nitrogen (mg/L)
0.12
Work Order Statistics
32
Total Orders
Pending 825%
In Progress 1237%
Completed 1031%
Closed 27%
Equipment Status
88%
Running Rate
Total112
Running98
Standby10
Fault6
🌊 Water Pumps28/30
💨 Blowers18/20
💉 Dosing Equipment15/18
📊 Instruments51/60
Water Supply Trend
Energy Statistics
Alert Trend
Real-Time Process Parameters
Raw Water Level
5.83m
Reaction Mixer
68rpm
Sludge Level
0.82m
Filter Pressure
26kPa
Clear Water pH
7.32
Pump Pressure
0.35MPa
24-Hour Trend Monitor
Water Quality Compliance Matrix
Parameter Plant Effluent DC Inlet Requirement Status Action
Turbidity 0.32 NTU <0.5 NTU ✓ PASS
pH 7.32 7.0-8.0 ✓ PASS
Residual Chlorine 0.68 mg/L 0.5-1.0 mg/L ✓ PASS
Conductivity 350 μS/cm <500 μS/cm ✓ PASS
Total Hardness 85 mg/L <100 mg/L ✓ PASS
Iron (Fe) 0.02 mg/L <0.3 mg/L ✓ PASS
30-Day Quality Trend
Total Consumption
12,546kWh
DC Pumping
4,200kWh
Treatment
4,325kWh
Efficiency
0.47kWh/m³
24-Hour Energy Trend
Equipment Asset Register
Equipment ID Status Runtime Next PM Health
🌊 Raw Water Pump P-01 PMP-001 ● Running 1,240 h 2025.10.25 94%
🌊 Raw Water Pump P-02 PMP-002 ● Running 1,180 h 2025.10.28 91%
🌊 Raw Water Pump P-03 PMP-003 ● Standby 890 h 2025.11.05 78%
💨 Blower B-01 BLW-001 ● Running 2,450 h 2025.10.30 88%
💉 Dosing Pump D-01 DOS-001 ● Fault 3,120 h OVERDUE 62%
📊 Turbidity Sensor T-01 SNS-001 ● Running 4,560 h 2025.11.12 96%
Active Alert Stream
🔴
High Vibration Detected — Pump P-03
2025.10.10 14:32 | Raw Water Pump Room | Threshold: 7.2 mm/s
🟠
Low Pressure — Pasir Gudang Branch MV-103
2025.10.10 14:15 | Distribution Network | Current: 0.18 MPa
🟡
Dosing Pump D-01 Calibration Due
2025.10.10 13:00 | Chemical Dosing | Scheduled: 2025.10.08
🟡
Elevated Conductivity — Sedenak DC Inlet
2025.10.10 12:45 | DC Distribution | Current: 485 μS/cm
Data Center Cooling Water Distribution
Total DC Flow
9,500m³/h
Total DC Allocation
45,000m³/day
Pumping Energy
4,200kWh
WUE
1.65L/kWh
Supply Network: Plant → PS-01 (km 8, 2,200 kW) → Ring-main → Sedenak (15km) | Nusajaya (22km) | Pasir Gudang (18km) | Skudai (12km)
🔷 Sedenak
Tier III-IV
AirTrunk, GDS, Bridge, Keppel
Flow Rate
4,200 m³/h
Pressure
0.28 MPa
Temperature
26.2 °C
PUE Water
1.25 avg
NORMAL 4 Operators
🔷 Nusajaya
Tier III
TM, NTT, STT GDC
Flow Rate
2,800 m³/h
Pressure
0.26 MPa
Temperature
26.5 °C
PUE Water
1.32 avg
NORMAL 3 Operators
🔷 Pasir Gudang
Tier II-III
Local / Cloud Edge Nodes
Flow Rate
1,500 m³/h
Pressure
0.24 MPa
Temperature
27.1 °C
PUE Water
1.45 avg
LOW PRESSURE 2 Operators
🔷 Skudai
Tier II-III
Enterprise DCs
Flow Rate
1,000 m³/h
Pressure
0.25 MPa
Temperature
26.8 °C
PUE Water
1.38 avg
NORMAL 2 Operators
DC Cooling Water Quality at Inlet
Generated Reports
📄
Daily Operations Report
Auto-generated at 06:00 | Production, Quality, Energy, Alerts
📊
Monthly Regulatory Compliance
EPA/GB 5749 submission | October 2025
💰
OPEX Analysis — DC Cooling Allocation
Chemical, energy, labor per m³ by cluster
🔮
Capacity Planning Forecast
5-year demand projection with expansion scenarios
System Settings

Alert Thresholds

Turbidity Max 0.5 NTU
Chlorine Range 0.5 - 1.0 mg/L
DC Pressure Min 0.22 MPa

System Status

SCADA Connection ● Connected
Database Sync ● Real-time
Last Backup 2025.10.10 04:00